Public Works – Special Districts Water and Sanitation staff presented a proposed rate plan to…
RATES, FEES, AND IMPORTANT INFORMATION
Public Works – Special Districts Water and Sanitation staff presented a proposed rate plan to the CSA 70 CG community on Wednesday, March 18, 2026. The Special Districts team engaged with attending residents and addressed questions raised during the meeting. CSA Rate Presentation
CSA 70CG Rate Meeting Flyer – 04/16/2026
Corrosion Control Desktop Study 2017
Water Rates
| Facility Charge by Meter Size | Monthly Fee |
|---|---|
| Flat Rate | $188.85 |
| 5/8″ | $35.26 |
| 3/4″ | $35.26 |
| 1″ | $57.84 |
| 1-1/2″ | $113.75 |
| 2″ | $181.11 |
| 3″ | $360.96 |
| 4″ | $563.05 |
| 6″ | $1,124.19 |
| 8″ | $1,797.81 |
| Bi-Monthly Water Consumption | Bi-Monthly Fee per hcf |
|---|---|
| 0-6 hcf* | $10.08 |
| >7-12 hcf* | $10.32 |
| >13+ hcf* and above | $11.18 |
*hcf = 100 cubic feet or 748 gallons of water
Connection Fees
| Type of Connection | Cost |
|---|---|
| Water Connection Fee | $5,629.24 |
Additional Information
CSA 70 CG 2024 Consumer Confidence Report
CSA 70 CG 2023 Consumer Confidence Report